EconPapers    
Economics at your fingertips  
 

Implementation of the Monitoring Center for Prevention (MCP) Program in the Regional Inspectorate of the Province of North Sulawesi

Marsela Elsa Rondonuwu, Evi Elvira Masengi and Laurens Bulo
Additional contact information
Marsela Elsa Rondonuwu: Public Administration Magister Program, Universitas Negeri Manado, Indonesia
Evi Elvira Masengi: Public Administration Magister Program, Universitas Negeri Manado, Indonesia
Laurens Bulo: Public Administration Magister Program, Universitas Negeri Manado, Indonesia

Technium Social Sciences Journal, 2025, vol. 69, issue 1, 1-12

Abstract: The purpose of this research is to find out, analyze, and describe the implementation and determinant factors that exist in the Monitoring Center For Prevention (MCP) Program at the Regional Inspectorate of North Sulawesi Province. This research uses qualitative research methods. The results showed that first, the Capacity of Government Internal Supervisory Apparatus (APIP); In the implementation of supervision in the regional inspectorate, functional APIP for the first level is still lacking, functional competency improvement of APIP has not been fulfilled, and the budget for increasing APIP capacity is still lacking. Second, Institutional Strengthening; The filling of inspector and irbansus positions in the regional inspectorate is in accordance with procedures and the availability of supporting facilities for the implementation of supervision is not sufficient. Third, Control and Supervision; Forms of control and supervision from the Regional Inspectorate of North Sulawesi Province are the availability of media for handling public complaints, namely through the SP4N report application, telephone numbers to contact, websites, emails and can be brought directly to the inspectorate office. Anti-corruption socialization has been carried out aimed at the executive, namely the chairman, deputy and members of the DPRD, regional officials and their staff, village heads and village officials and the community. Determinant factors are that the budget for the implementation of supervision is still lacking, only getting 0.26 of the APBD which should be 0.9 of the APBD. The supporting facilities and infrastructure available in the implementation of supervision are inadequate, the filling of the first functional auditor position is not in accordance with the procedure.

Date: 2025
References: Add references at CitEc
Citations:

Downloads: (external link)
https://techniumscience.com/index.php/socialsciences/article/view/12300 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:tec:journl:ojs:12300

DOI: 10.47577/tssj.v69i1.12300

Access Statistics for this article

Technium Social Sciences Journal is currently edited by Tasente Tanase

More articles in Technium Social Sciences Journal from Technium Science
Bibliographic data for series maintained by Tasente Tanase ( this e-mail address is bad, please contact ).

 
Page updated 2026-10-12
Handle: RePEc:tec:journl:ojs:12300