Challenges in pricing preliminaries costs for contractors: An Australian case study
O’Leary Timothy () and
Vaz-Serra Paulo
Additional contact information
O’Leary Timothy: Faculty of Architecture, Building and Planning, University of Melbourne, Parkville, Victoria 3010, Australia.
Vaz-Serra Paulo: Faculty of Architecture, Building and Planning, University of Melbourne, Parkville, Victoria 3010, Australia
Organization, Technology and Management in Construction, 2025, vol. 17, issue 1, 126-142
Abstract:
The accurate estimation of project costs is pivotal for the ongoing financial success of construction companies. Despite the clear definition of direct costs in tendering information, indirect costs (also known as project overheads and preliminaries) are often overlooked or underestimated. These costs are influenced by various factors, including company resource availability, site and project characteristics, contractual conditions and procurement methods. The pricing of preliminaries is a complex task, and the varying nature of these costs, coupled with the lack of transparency in current pricing practices, can lead to significant discrepancies in tender pricing. The challenge is to identify what should be included in preliminaries and arrive at a value in practice. This research has explored how contractors’ estimating departments address the complexities of pricing preliminaries for building and civil infrastructure works, particularly considering stringent contractual requirements and post-pandemic construction market disruptions. Through a literature review and an online survey of 30 senior estimators from major contractors, addressing 18 questions, the research sought to understand current practices, differing approaches and metrics employed in pricing preliminaries during the tendering stage. The multifaceted nature of preliminary studies was examined, offering a structured analysis of their categorisation, estimation methods, associated challenges and the impact of project delivery methods. The findings reveal that each contractor processes the pricing of preliminaries using certain tendering gateways and a variety of different metrics. This indicates that systematic risk and pricing models for contractors may lack a justifiable basis, with existing pricing models facing acceptance challenges across different contractors.
Keywords: contractor; costs; preliminaries; estimating; tendering (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.2478/otmcj-2025-0008 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:vrs:otamic:v:17:y:2025:i:1:p:126-142:n:1008
DOI: 10.2478/otmcj-2025-0008
Access Statistics for this article
Organization, Technology and Management in Construction is currently edited by Mladen Radujković
More articles in Organization, Technology and Management in Construction from Sciendo
Bibliographic data for series maintained by Peter Golla ().