EconPapers    
Economics at your fingertips  
 

An artificial neural network model to relate organisation characteristics and delivery methods of construction projects

Pashaian Moein, Malidareh Babak Fazli () and Tabandeh Seyedeh Mona
Additional contact information
Pashaian Moein: Department of Civil Engineering, Sari Branch, Islamic Azad University, Sari, Iran
Malidareh Babak Fazli: Department of Civil Engineering, Babol Branch, Islamic Azad University, Babol, Iran
Tabandeh Seyedeh Mona: Department of Civil Engineering, Babol Branch, Islamic Azad University, Babol, Iran.

Organization, Technology and Management in Construction, 2025, vol. 17, issue 1, 67-82

Abstract: This paper presents an artificial neural network (ANN) model designed to predict the optimal delivery methods for construction projects based on organisational characteristics. Effective organisational characteristics were identified through a combination of the Delphi method and data collected via questionnaire surveys. The study sample consisted of 354 construction experts selected using a random sampling method. The validity and reliability of the research were confirmed through the formcontent validity and the Cronbach’s alpha test, respectively. The ANN model, implemented using RapidMiner software, demonstrated a prediction accuracy of 76.42%. The results revealed that financial, managerial, contextual, optimisation, and manpower variables significantly impact the prediction of the delivery method. Compared to other data mining models, such as the decision tree, random forest, and support vector machine (SVM), the ANN model showed a superior accuracy. This research highlights the contribution of organisational characteristics in forecasting the delivery methods of construction projects and offers a novel approach to improving project delivery decisions. While the findings are based on data from the Mazandaran province in Iran, the methodology and insights can be adapted and applied to other regions with similar organisational characteristics, suggesting a potential for generalisation.

Keywords: artificial neural network; organisational characteristics; delivery of construction projects (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:

Downloads: (external link)
https://doi.org/10.2478/otmcj-2025-0004 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:vrs:otamic:v:17:y:2025:i:1:p:67-82:n:1003

DOI: 10.2478/otmcj-2025-0004

Access Statistics for this article

Organization, Technology and Management in Construction is currently edited by Mladen Radujković

More articles in Organization, Technology and Management in Construction from Sciendo
Bibliographic data for series maintained by Peter Golla ().

 
Page updated 2025-06-24
Handle: RePEc:vrs:otamic:v:17:y:2025:i:1:p:67-82:n:1003