EconPapers    
Economics at your fingertips  
 

Group technology in production management: The short horizon planning level

Hervé Garcia and Jean Marie Proth

Applied Stochastic Models and Data Analysis, 1985, vol. 1, issue 1, 25-34

Abstract: We consider a set of parts divided into subsets called part types, determined in such a way that the parts belonging to the same part type are manufactured using the same sequence of tasks (i.e. the same working process). We are looking for a partition of the set of part types into subsets called part families, and for a partition of the set of tasks into subsets called production subsystems defined as follows: (1) the number of part families and the number of production subsystems are equal, (2) one (one only one) production subsystem corresponds to each part family, (3) one (and only one) part family corresponds to each production subsystem, (4) the previous partitions minimize the number of tasks performed in a production subsystem different from that which corresponds to the part family containing the part involved. We give a fast algorithm which leads to a good solution depending on the initial set of part families. We also propose an algorithm to find a ‘good’ initial set of part families.

Date: 1985
References: Add references at CitEc
Citations:

Downloads: (external link)
https://doi.org/10.1002/asm.3150010105

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:apsmda:v:1:y:1985:i:1:p:25-34

Access Statistics for this article

More articles in Applied Stochastic Models and Data Analysis from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:apsmda:v:1:y:1985:i:1:p:25-34