EconPapers    
Economics at your fingertips  
 

An application of statistical techniques to estimate engineering man‐hours on major aircraft programs

D. B. Owen and D. F. Reynolds

Naval Research Logistics Quarterly, 1968, vol. 15, issue 4, 579-593

Abstract: Data on 23 lots of various aircraft programs were gathered. Total engineering man‐hours, and information on performance, weight, area, avionics systems, data, and schedule were subjected to least squares analysis. An equation is presented which indicates a relationship between total engineering manhours and a set of seven predictor variables. While the equation derived could only be used with confidence by the manufacturer whose data was analyzed, this article should be looked upon as demonstrating a method of data analysis which others may also find useful, not only for predicting engineering manhours in major aircraft programs, but also in other situations where there is an abundance of possible predictor variables, and the problem is to sort out a meaningful subset of these variables. In order to demonstrate the viability of the formula obtained, comparisons were made with various bid programs.

Date: 1968
References: Add references at CitEc
Citations:

Downloads: (external link)
https://doi.org/10.1002/nav.3800150410

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navlog:v:15:y:1968:i:4:p:579-593

Access Statistics for this article

More articles in Naval Research Logistics Quarterly from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navlog:v:15:y:1968:i:4:p:579-593