Scheduling peacetime rotation of Pakistan army units
Robert F. Dell,
Richard E. Rosenthal and
Shafqat Baig
Naval Research Logistics (NRL), 1995, vol. 42, issue 1, 1-13
Abstract:
Because Pakistan has varying climates and terrains, the Pakistan Army rotates its units between peacetime locations so that no unit endures inequitable hardship or enjoys unfair advantage. Army policy specifies strict constraints on unit rotations, such as the length of a unit's stay in any location, the number of units moving at any time, and the allowable replacements for any moving unit. Scheduling rotations manually in accordance with these rules, as is currently practiced, is extremely difficult and time consuming. This article presents an integer programming model that finds feasible, minimum‐cost schedules for the Pakistan Army's desired planning horizons. The model also ensures that the units are positioned at the end of the planning horizon so that feasible schedules exist for future planners. The model is implemented with commercially available optimization software. Schedules are obtained for realistic test problems in less than an hour on a personal computer. © 1995 John Wiley & Sons, Inc.
Date: 1995
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/1520-6750(199502)42:13.0.CO;2-B
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:42:y:1995:i:1:p:1-13
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().