EconPapers    
Economics at your fingertips  
 

Note: “Simultaneous optimization of efficiency and performance balance measures in single‐machine scheduling problems”

Michael X. Weng and Jose A. Ventura

Naval Research Logistics (NRL), 1996, vol. 43, issue 2, 313-318

Abstract: n independent jobs are to be scheduled nonpreemptively on a single machine so as to minimize some performance measure. Federgruen and Mosheiov [2] show that a large class of such scheduling problems can be optimized by solving either a single instance or a finite sequence of instances of the so‐called SQC problem, in which all the jobs have a fixed or controllable common due date and the sum of general quasiconvex functions of the job completion times is to be minimized. In this note we point out that this is not always true. In particular, we show that the algorithm proposed in [2] does not always find a global optimal schedule to the problem of minimizing the weighted sum of the mean and variance of job completion times. © 1996 John Wiley & Sons, Inc.

Date: 1996
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://doi.org/10.1002/(SICI)1520-6750(199603)43:23.0.CO;2-W

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:43:y:1996:i:2:p:313-318

Access Statistics for this article

More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:navres:v:43:y:1996:i:2:p:313-318