Computational study of the multiechelon production planning problem
Sunil Chopra,
M.R. Rao and
Chih‐Yang Tsai
Naval Research Logistics (NRL), 1997, vol. 44, issue 1, 1-19
Abstract:
In this article we try to identify appropriate solution procedures for different types of multiechelon production planning problems. We conduct an extensive computational study on uncapacitated multiechelon production planning problems with serial and assembly types of bill‐of‐material structures. Problems are formulated as both single‐source fixed charge network problems and as multicommodity flow problems with fixed charges. Solution procedures considered are branch and cut, Lagrangean relaxation (for the network formulation), and branch and bound (for the multicommodity formulation). Three hundred problems with various problem structures are tested. Our conclusions suggest the best approach for each type of problem structure. © 1997 John Wiley & Sons, Inc.
Date: 1997
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/(SICI)1520-6750(199702)44:13.0.CO;2-E
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:44:y:1997:i:1:p:1-19
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().