EconPapers    
Economics at your fingertips  
 

Project procurement systems in the attainment of sustainable construction

P. D. Rwelamila, A. A. Talukhaba and A. B. Ngowi
Additional contact information
P. D. Rwelamila: University of Cape Town, South Africa, Postal: University of Cape Town, South Africa
A. A. Talukhaba: University of Nairobi, Kenya, Postal: University of Nairobi, Kenya
A. B. Ngowi: University of Botswana, Botswana, Postal: University of Botswana, Botswana

Sustainable Development, 2000, vol. 8, issue 1, 39-50

Abstract: The construction industry makes a vital contribution to the social and economic development of every country, but, at the same time, its building sector has major impacts on the environment. Construction is a major consumer of non-renewable resources (energy in particular), a substantial source of waste, a polluter of air and water and an important contributor to land dereliction. This paper focuses specifically on the growing lack of focus on construction sustainability in the Southern Africa Development Community (SADC) public building sector. It indicates some salient issues on sustainable construction and the need for appropriate procurement systems, using the Botswana public building sector as a case study. It addresses two propositions. First that lack of appropriate focus on sustainable construction is primarily due to an inappropriate project organizational structure. Second that a default traditional construction procurement system (TCPS) provides a poor relationship management system incapable of dealing with sustainability parameters. Information is obtained through questionnaires on the dominant procurement system used. The primary conclusion is that the building procurement system apparently in use in the SADC public building sector differs significantly from that recommended in the theory, resulting in insignificant focus on construction sustainability. Salient steps are proposed with a proviso that the SADC public building sector should establish appropriate methods of selecting building procurement systems and formulate appropriate project organizational structures that will embrace an environmental management system. Copyright © 2000 John Wiley & Sons, Ltd and ERP Environment

Date: 2000
References: View complete reference list from CitEc
Citations: View citations in EconPapers (8)

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:sustdv:v:8:y:2000:i:1:p:39-50

DOI: 10.1002/(SICI)1099-1719(200002)8:1<39::AID-SD127>3.0.CO;2-Z

Access Statistics for this article

Sustainable Development is currently edited by Richard Welford

More articles in Sustainable Development from John Wiley & Sons, Ltd.
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:sustdv:v:8:y:2000:i:1:p:39-50