A MAINTENANCE MODEL FOR MANUFACTURING LEAD TIME IN A PRODUCTION SYSTEM WITH BMAP INPUT AND BILEVEL SETUP CONTROL
Ho Woo Lee () and
No Ik Park ()
Additional contact information
Ho Woo Lee: Dept. of Systems Management Engineering, Sungkyunkwan University, Suwon, Korea
No Ik Park: Converged Network Architecture Research Team, Network Research Division, Broadcasting & Telecommunications Convergence Research Laboratory, ETRI, Daejon, Korea
Asia-Pacific Journal of Operational Research (APJOR), 2008, vol. 25, issue 06, 807-825
Abstract:
In this paper, the manufacturing lead time in a production system with maintenance period, non-renewal BMAP (Batch Markovian Arrival process) input and bilevel threshold control is analyzed. The factorization principle is used to derive the distribution of the manufacturing lead time and the mean value. A numerical example is provided to see the effect of the non-renewal input on the system performance.
Keywords: Maintenance period; BMAP arrivals; manufacturing lead time (search for similar items in EconPapers)
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.worldscientific.com/doi/abs/10.1142/S0217595908002036
Access to full text is restricted to subscribers
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wsi:apjorx:v:25:y:2008:i:06:n:s0217595908002036
Ordering information: This journal article can be ordered from
DOI: 10.1142/S0217595908002036
Access Statistics for this article
Asia-Pacific Journal of Operational Research (APJOR) is currently edited by Gongyun Zhao
More articles in Asia-Pacific Journal of Operational Research (APJOR) from World Scientific Publishing Co. Pte. Ltd.
Bibliographic data for series maintained by Tai Tone Lim ().