EconPapers    
Economics at your fingertips  
 

Optimal Sequential Investment Decision-Making with Jump Risk

I-Ming Jiang, Yu-Hong Liu () and Sutee Pakavaleetorn ()
Additional contact information
I-Ming Jiang: Faculty of Digital Finance, College of Management, Yuan Ze University, No. 135, Far-East Road, Chung-Li, Taoyuan, Taiwan, ROC
Yu-Hong Liu: Department of Accountancy and Graduate Institute of Finance, National Cheng Kung University, Tainan City 70101, Taiwan, ROC
Sutee Pakavaleetorn: Department of Accountancy and Graduate Institute of Finance, National Cheng Kung University, Tainan City 70101, Taiwan, ROC

Asia-Pacific Journal of Operational Research (APJOR), 2022, vol. 39, issue 04, 1-19

Abstract: This paper uses the real-option approach to find the optimal amount and time of investment in a real project. This approach is better than the net present value approach because it captures the uncertainty in the future expected cash flow. The real option has been applied to many industries; for example, oil and gas, telecommunications, and large-scale energy projects. The model introduced in this paper adds two features to the standard real options. The first feature is the two-stage investment. In reality, it is common for the project manager to not invest all budget at once. The second feature is the early termination event. The finding is that such a sudden death event causes the waiting period to be longer for both one-stage and two-stage investments. With low volatility, the lower optimal investment proportion of the total project budget is expected, when the mean arrival rate of the jump downside risk is higher. With medium or higher volatility, the higher optimal proportion is associated with a higher probability of jump risk. When the rate of one-time event is constant, volatility increases the optimal investment amount and increases the waiting time. The project has more value when the investment is divided into two stages rather than one stage. All other things being equal, the waiting time of one-stage is shorter than the waiting time of the first stage but longer than that of the second stage.

Keywords: Real option; sequential investment; investment proportion; jump risk (search for similar items in EconPapers)
Date: 2022
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.worldscientific.com/doi/abs/10.1142/S0217595921400352
Access to full text is restricted to subscribers

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wsi:apjorx:v:39:y:2022:i:04:n:s0217595921400352

Ordering information: This journal article can be ordered from

DOI: 10.1142/S0217595921400352

Access Statistics for this article

Asia-Pacific Journal of Operational Research (APJOR) is currently edited by Gongyun Zhao

More articles in Asia-Pacific Journal of Operational Research (APJOR) from World Scientific Publishing Co. Pte. Ltd.
Bibliographic data for series maintained by Tai Tone Lim ().

 
Page updated 2025-04-20
Handle: RePEc:wsi:apjorx:v:39:y:2022:i:04:n:s0217595921400352