REVIEW OF ECOLOGICAL INPUT IN PRELIMINARY EIAS FOR COASTAL RESORT DEVELOPMENT PROJECTS IN MALAYSIA
Leong-Wan Vun (),
Abdul Latiff and
Mohd Nordin
Additional contact information
Leong-Wan Vun: School of Science & Technology, Universiti Malaysia Sabah, 88502 Kota Kinabalu, Sabah, Malaysia
Abdul Latiff: Faculty of Science & Technology, Universiti Kebangsaan Malaysia, 43600 Bangi, Selangor, Malaysia
Mohd Nordin: Environmental Management & Research Association, Malaysia
Journal of Environmental Assessment Policy and Management (JEAPM), 2004, vol. 06, issue 03, 385-401
Abstract:
In Malaysia, environmental impact assessment (EIA) has been mandatory since 1988 as a proactive tool in environmental management for 19 prescribed activities. Since ecological information is an important component in EIA, this study examined the quality of ecological input in 41 preliminary EIAs for coastal resort development. Twelve criteria relating to ecological data, impact prediction, evaluation of impact significance, mitigating measures, residual impacts, monitoring, communication of the report and consultants were reviewed. Results revealed that only 27 percent of the EIAs were found to be satisfactory, whereas the others were at borderline or poor. In describing the existing environment, the majority of the reports made no mention of the survey methods, some of the data included were found to be not site-specific and up-to-date, and the sources of the secondary data presented in these reports were mostly not quoted. There was a tendency to survey terrestrial habitats more than aquatic, and higher plants are surveyed more than animals. Most of the reports also failed to mention the species status although comprehensive lists of species were present. They also failed to quantify the species present in the impacted areas which could lead to inadequate ecological impact prediction. The study also showed that, though all the reports contained a section on ecology, not all the EIA consultants involved in preparing these reports comprised of a multidisciplinary team that has an ecologist/biologist or environmental scientist.
Keywords: Ecological input; ecological impact assessment; EIA (search for similar items in EconPapers)
Date: 2004
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.worldscientific.com/doi/abs/10.1142/S146433320400178X
Access to full text is restricted to subscribers
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wsi:jeapmx:v:06:y:2004:i:03:n:s146433320400178x
Ordering information: This journal article can be ordered from
DOI: 10.1142/S146433320400178X
Access Statistics for this article
Journal of Environmental Assessment Policy and Management (JEAPM) is currently edited by Thomas Fischer
More articles in Journal of Environmental Assessment Policy and Management (JEAPM) from World Scientific Publishing Co. Pte. Ltd.
Bibliographic data for series maintained by Tai Tone Lim ().