EconPapers    
Economics at your fingertips  
 

Self-Correcting Mechanisms in Public Procurement: Why Award and Contract Should be Separated

Dieter Bös and Martin Kolmar

No 5/2000, Bonn Econ Discussion Papers from University of Bonn, Bonn Graduate School of Economics (BGSE)

Abstract: In public procurement a temporal separation of award and actual contracting can frequently be observed. In this paper we give an explanation for this institutional setting. For incomplete procurement contracts we show that such a separation may increase efficiency. We show that efficiency can be increased by post-award, pre-contract negotiations between the award-winning seller and one of the `losing' sellers. Surprisingly, the efficiency gains can be higher if the award is given to a seller with a lower reputation for quality instead of to a seller with higher reputation. Under certain conditions post-award, pre-contract rent-seeking activities also increase efficiency. This is always the case if the procurement agency is corrupt, but may also occur in the case of lobbying.

Keywords: Procurement; Incomplete contracts; lobbying; corruption (search for similar items in EconPapers)
JEL-codes: D23 H57 L51 (search for similar items in EconPapers)
Date: 2000
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.econstor.eu/bitstream/10419/78403/1/bgse5_2000.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:zbw:bonedp:52000

Access Statistics for this paper

More papers in Bonn Econ Discussion Papers from University of Bonn, Bonn Graduate School of Economics (BGSE) Contact information at EDIRC.
Bibliographic data for series maintained by ZBW - Leibniz Information Centre for Economics ().

 
Page updated 2025-03-20
Handle: RePEc:zbw:bonedp:52000