Finite scheduling capabilities of commercial project management systems
Rainer Kolisch and
Kai Hempel
No 397, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel from Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre
Abstract:
This study assesses the quality of seven commercial project management systems to perform finite scheduling. We give a brief survey of the way commercial project management systems work and especially how they perform finite scheduling. Since the implemented methods are proprietary, we measure the quality of the Software in terms of the deviation from a strong lower bound of the minimum makespan. As benchmark instances we use a set of problems generated under a factorial design. Statistical tests are performed in order to investigate the impact of the problem parameters and to detect significant differences between the quality of the Software packages.
Date: 1996
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.econstor.eu/bitstream/10419/149844/1/manuskript_397.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:zbw:cauman:397
Access Statistics for this paper
More papers in Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel from Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre Contact information at EDIRC.
Bibliographic data for series maintained by ZBW - Leibniz Information Centre for Economics ().