Some insights into proportional lot sizing and scheduling
Alf Kimms and
Andreas Drexl
No 406, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel from Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre
Abstract:
This paper deals with proportional lot sizing and scheduling (PLSP) and gives some insights into the properties of this problem. Such insights may be useful for developing heuristic and/or exact solution procedures. The emphasis of this paper is on the multi-level, multi-machine case. We provide a mixed-integer programming model, relate it to other models that can be found in the literature, and discuss characteristics which make solving instances of the PLSP-model become a hard task.
Keywords: Multi-level lot sizing; scheduling; initial inventory; lot splitting; valid constraints; postprocessing (search for similar items in EconPapers)
Date: 1996
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://www.econstor.eu/bitstream/10419/149037/1/manuskript_406.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:zbw:cauman:406
Access Statistics for this paper
More papers in Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel from Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre Contact information at EDIRC.
Bibliographic data for series maintained by ZBW - Leibniz Information Centre for Economics ().