Lot sizing and scheduling: Survey and extensions
Andreas Drexl and
Alf Kimms
No 421, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel from Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre
Abstract:
This contribution summarizes recent work in the field of lot sizing and scheduling. The objective is not to give a comprehensive literature survey, but to explain differences of formal models and to provide some first readings recommendations. Our focus is on capacitated, dynamic, and deterministic cases. To underscore the importance of the research efforts, current practice is described and its shortcomings are exposed. Mathematical programming models where the planning horizon is subdivided into several discrete periods are given for both, approaches that are well-established and approaches which may represent tomorrow's state of the art. Two research directions are discussed in more detail: Continuous time models and multi-level lot sizing and scheduling. The paper concludes with some advice for future research activities.
Keywords: Production planning; lot sizing; scheduling; CLSP; DLSP; CSLP; PLSP; BSP (search for similar items in EconPapers)
Date: 1996
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.econstor.eu/bitstream/10419/175395/1/manuskript_421.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:zbw:cauman:421
Access Statistics for this paper
More papers in Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel from Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre Contact information at EDIRC.
Bibliographic data for series maintained by ZBW - Leibniz Information Centre for Economics ().