EconPapers    
Economics at your fingertips  
 

Assessing Discount Rate for a Project Financed Entirely with Equity Capital

Nicoleta Vintilă

Theoretical and Applied Economics, 2007, vol. 9(514), issue 9(514), 11-20

Abstract: Estimating discount rate for an investment project is one of the most challenging tasks in capital budgeting. In this paper we discuss different kind of models for cost of equity capital proposed in finance literature (static CAPM, conditional CAPM, APT, build-up model), focusing especially on advantages and disadvantages of using each of them. In the final section, we estimate the discount rate for a certain project financed entirely with equity capital, using a version of build-up model.

Keywords: capital budgeting; discount rate; cost of equity capital; risk-return models; build-up models. (search for similar items in EconPapers)
Date: 2007
References: Add references at CitEc
Citations:

Downloads: (external link)
http://store.ectap.ro/articole/247.pdf (application/pdf)
http://www.ectap.ro/articol.php?id=247&rid=29 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:agr:journl:v:9(514):y:2007:i:9(514):p:11-20

Access Statistics for this article

Theoretical and Applied Economics is currently edited by Mircea Dinu

More articles in Theoretical and Applied Economics from Asociatia Generala a Economistilor din Romania / Editura Economica Contact information at EDIRC.
Bibliographic data for series maintained by Mircea Dinu ().

 
Page updated 2025-03-19
Handle: RePEc:agr:journl:v:9(514):y:2007:i:9(514):p:11-20