EXISTENCE OF THE STANDARD SYSTEM IN THE MULTIPLE‐PRODUCTION CASE: A SOLUTION TO THE MANARA PROBLEM
Michel‐Stéphane Dupertuis and
Ajit Sinha
Metroeconomica, 2009, vol. 60, issue 3, 432-454
Abstract:
In this paper we show that the Manara problem in the case of Sraffa's generalized multiple‐production case arises due to the presence of superfluous processes of production. We argue that ‘goods’ should be defined from the perspective of the system and not the observer. We provide a mathematical procedure to remove superfluous processes from the construction of Sraffa's Standard system. Once this is done, the Manara problem disappears.
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
https://doi.org/10.1111/j.1467-999X.2008.00349.x
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:bla:metroe:v:60:y:2009:i:3:p:432-454
Ordering information: This journal article can be ordered from
http://www.blackwell ... bs.asp?ref=0026-1386
Access Statistics for this article
Metroeconomica is currently edited by Heinz D. Kurz and Neri Salvadori
More articles in Metroeconomica from Wiley Blackwell
Bibliographic data for series maintained by Wiley Content Delivery ().