Economic Process Control
B.F. Arnold and
E. von Col Iani
Statistica Neerlandica, 1987, vol. 41, issue 2, 89-97
Abstract:
A simple method is developed how to determine a nearly optimal economic sampling design tor current process control. A comparison between Shewhart and non Shewhart techniques reveals that under the assumptions of a normally distributed quality characteristic and an exponentially distributed time of production in the state of control the superiority of non Shewhart techniques is in general of no importance.
Date: 1987
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1111/j.1467-9574.1987.tb01175.x
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:bla:stanee:v:41:y:1987:i:2:p:89-97
Ordering information: This journal article can be ordered from
http://www.blackwell ... bs.asp?ref=0039-0402
Access Statistics for this article
Statistica Neerlandica is currently edited by Miroslav Ristic, Marijtje van Duijn and Nan van Geloven
More articles in Statistica Neerlandica from Netherlands Society for Statistics and Operations Research
Bibliographic data for series maintained by Wiley Content Delivery ().