The Use of Economic Analysis in the Tennessee Valley Authority: The Case of the Duck River Project
Leonard Shabman
Journal of Agricultural and Applied Economics, 1973, vol. 5, issue 1, 245-252
Abstract:
In September, 1968 the Tennessee Valley Authority recommended construction of two dams on the Duck River in middle Tennessee. Subsequently, an environmental impact statement (EIS) was prepared which further described the plan and provided a summary of the national economic efficiency justification for its implementaion. Table 1 summarizes the EIS justification. However, the accuracy of the EIS analysis may be subject to question. This paper evaluates the sensitivity of the EIS national economic analysis to changes in expansion benefit estimates, reconsideration of cost estimates and their use, and the discount rate used for analysis. Also discussed is the consideration given to alternatives to the Duck River Project, and institutional limitations on the TVA's mission that affect the use of economic analysis.
Date: 1973
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.cambridge.org/core/product/identifier/ ... type/journal_article link to article abstract page (text/html)
Related works:
Journal Article: THE USE OF ECONOMIC ANALYSIS IN THE TENNESSEE VALLEY AUTHORITY: THE CASE OF THE DUCK RIVER PROJECT (1973) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cup:jagaec:v:5:y:1973:i:01:p:245-252_01
Access Statistics for this article
More articles in Journal of Agricultural and Applied Economics from Cambridge University Press Cambridge University Press, UPH, Shaftesbury Road, Cambridge CB2 8BS UK.
Bibliographic data for series maintained by Kirk Stebbing ().