Simulation and optimization of a CHP biomass plant and district heating network
K. Sartor,
S. Quoilin and
P. Dewallef
Applied Energy, 2014, vol. 130, issue C, 474-483
Abstract:
Biomass combined heat and power (CHP) plants connected to district heating (DH) networks are recognized nowadays as a very good opportunity to increase the share of renewable sources into energy systems. However, as CHP plants are not optimized for electricity production, their operation is profitable only if a sufficient heat demand is available throughout the year. Most of the time, pre-feasibility studies are based on peak power demand and business plans only assume monthly or yearly consumption data. This approach usually turns out to overestimate the number of operating hours or oversize the plant capacity.
Keywords: Biomass; Combined heat and power; Power plant; DHN; District heating network; Wood pellet (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (48)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S030626191400138X
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:appene:v:130:y:2014:i:c:p:474-483
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/bibliographic
http://www.elsevier. ... 405891/bibliographic
DOI: 10.1016/j.apenergy.2014.01.097
Access Statistics for this article
Applied Energy is currently edited by J. Yan
More articles in Applied Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().