Abstract:
Internal electrical networks of large wind farms constitute complex and dispersed grid structures. Wind turbines are scattered over vast areas and the total length of cabling infrastructure might reach several dozens of kilometers. Outlays related to cable laying significantly contribute to the entire project budget. Therefore the design process should minimize these expenses considering also operation and maintenance costs calculated over the project lifetime on condition of fulfilment of all technical requirements. An analysis presented in this paper demonstrates that an independent optimization of the twofold problem dealing both with investment and operation costs does not result in the cheapest solution. The analysis confirmed also reliability and effectiveness of application of Mixed Integer Linear Programming method (MILP) to solve this kind of optimization problem. The paper shows that the developed integrated optimization algorithm is efficient and delivers an absolute optimal solution (GAP=0) in a reasonable computation time. The results obtained for a real wind farm project confirm that the optimal design of a wind farm network can’t be determined a priori and the final outcome strongly depends on the configuration of wind turbines (e.g., number of feeders, number of turbines connected to a single feeder, etc.) and technical parameters of cables. Spread over time, discounted costs of energy losses are an integral part of the objective function. The study proves that cost of energy losses impacts on the overall financial results and shouldn’t be neglected. The related expenses are roughly at the same level as expenditure linked to cable laying and they heavily influence the final design of the internal network. The results show the possibility of practical use of the proposed algorithm in the wind farm design process.
Keywords: Renewable energy; Wind energy; Wind farm; Wind farm layout optimization; Cable layout optimization; Mixed Integer Linear Programming (MILP) (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (18)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0306261916311928
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:appene:v:182:y:2016:i:c:p:525-538
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/bibliographic
http://www.elsevier. ... 405891/bibliographic
DOI: 10.1016/j.apenergy.2016.08.094
Access Statistics for this article
Applied Energy is currently edited by J. Yan
More articles in Applied Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().