Practical factors of envelope model setup and their effects on the performance of model predictive control for building heating, ventilating, and air conditioning systems
D.H. Blum,
K. Arendt,
L. Rivalin,
M.A. Piette,
M. Wetter and
C.T. Veje
Applied Energy, 2019, vol. 236, issue C, 410-425
Abstract:
Model predictive control (MPC) for buildings is attracting significant attention in research and industry due to its potential to address a number of challenges facing the building industry, including energy cost reduction, grid integration, and occupant connectivity. However, the strategy has not yet been implemented at any scale, largely due to the significant effort required to configure and calibrate the model used in the MPC controller. While many studies have focused on methods to expedite model configuration and improve model accuracy, few have studied the impact a wide range of factors have on the accuracy of the resulting model. In addition, few have continued on to analyze these factors’ impact on MPC controller performance in terms of final operating costs. Therefore, this study first identifies the practical factors affecting model setup, specifically focusing on the thermal envelope. The seven that are identified are building design, model structure, model order, data set, data quality, identification algorithm and initial guesses, and software tool-chain. Then, through a large number of trials, it analyzes each factor’s influence on model accuracy, focusing on grey-box models for a single zone building envelope. Finally, this study implements a subset of the models identified with these factor variations in heating, ventilating, and air conditioning MPC controllers, and tests them in simulation of a representative case that aims to optimally cool a single-zone building with time-varying electricity prices. It is found that a difference of up to 20% in cooling cost for the cases studied can occur between the best performing model and the worst performing model. The primary factors attributing to this were model structure and initial parameter guesses during parameter estimation of the model.
Keywords: Model predictive control; Building simulation; HVAC; System identification (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (22)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0306261918318099
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:appene:v:236:y:2019:i:c:p:410-425
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/bibliographic
http://www.elsevier. ... 405891/bibliographic
DOI: 10.1016/j.apenergy.2018.11.093
Access Statistics for this article
Applied Energy is currently edited by J. Yan
More articles in Applied Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().