EconPapers    
Economics at your fingertips  
 

Value of regional constraint management services of vector-bridging systems in a heavily constrained network

Vahid Vahidinasab, Mahdi Habibi, Behnam Mohammadi-Ivatloo and Phil Taylor

Applied Energy, 2021, vol. 301, issue C, No S0306261921008151

Abstract: While a lot of countries put renewable energy sources at the heart of their decarbonization strategies with directed incentive mechanisms, the variability of the renewable energy sources, remains a major challenge for electricity system operators in ensuring the security of supply. This challenge is particularly onerous when there is a coincidence between this variability and congestion of the tie-lines. Renewable generation spillage often leads to constraints being placed on the output of renewable energy sources. This situation causes a significant cost for electricity system operators due to the need for constraint payments to be made to renewable generations. These increased costs will ultimately be recovered from energy customers. Maintaining the balance in the aforementioned decarbonization, security of supply and affordability is a challenge that constitutes the energy trilemma. The integration of electric power systems with other energy infrastructures, e.g., natural gas, could be a promising solution for achieving a balanced performance in the energy trilemma, controlling the fluctuation of renewable energy sources, and increasing the flexibility of the integrated systems. Considering this, a hybrid bridging-operational framework based on the vector-bridging system concept is proposed. Also, a day-ahead integrated scheduling model is proposed that optimizes the integrated operation by considering the constraint payment costs in a linear optimization model. Simulation results on a large test system indicated that the hybrid bridging-operational framework could reduce the total cost of the congested system by 65% and release up to 10% of the pipeline capacities while harvesting the wind generation and removing constraint payments to wind generators.

Keywords: Integrated gas and electricity networks; Vector-bridging system; Power-to-gas; Wind power; Constraint payment (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0306261921008151
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:appene:v:301:y:2021:i:c:s0306261921008151

Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/bibliographic
http://www.elsevier. ... 405891/bibliographic

DOI: 10.1016/j.apenergy.2021.117421

Access Statistics for this article

Applied Energy is currently edited by J. Yan

More articles in Applied Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:appene:v:301:y:2021:i:c:s0306261921008151