EconPapers    
Economics at your fingertips  
 

Windfall profit-aware stochastic scheduling strategy for industrial virtual power plant with integrated risk-seeking/averse preferences

Dongliang Xiao, Zhenjia Lin, Haoyong Chen, Weiqi Hua and Jinyue Yan

Applied Energy, 2024, vol. 357, issue C, No S030626192301824X

Abstract: The increasing penetration of renewable energy in power grids introduces higher levels of uncertainty, while current decision-making models typically favour either a risk-averse or risk-neural strategy, and the research works related to windfall profit-aware risk-seeking strategies are quite limited. In this paper, a novel concept of integrated risk-seeking/averse preference is proposed, and a windfall profit-aware stochastic scheduling model for an industrial virtual power plant (IVPP) is developed based on this type of risk preference, which can realize the joint management of potential high profits and extreme losses. Firstly, the potential best- and worst-case results are incorporated into the holistic decision-making framework, which are quantified by the value at best (VaB) and the conditional value at risk (CVaR) measures, respectively. Next, the windfall profit-aware stochastic scheduling model is developed for the optimal operation of IVPP in day-ahead and real-time electricity markets, where multi-type flexible resources, such as energy conversion and storage devices, industrial production workstations, material storages and financial instruments, are utilized to improve expected profits and minimize the potential risks. Specifically, two types of credit-based virtual transactions, increment and decrement bids, are employed by the IVPP to increase its trading flexibility in electricity markets. Finally, simulation studies are conducted for a multi-energy IVPP to validate the proposed windfall profit-aware framework and model, showcasing that the risk-seeking and risk-averse preferences of decision-makers can be fully satisfied simultaneously under actual market environment. Moreover, risk parameters can be adjusted accordingly to manage windfall profits, expected profits, and extreme losses flexibly in electricity markets.

Keywords: Risk preference; Renewable energy; Stochastic optimization; Virtual power plant; Windfall profit (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (7)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S030626192301824X
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:appene:v:357:y:2024:i:c:s030626192301824x

Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/bibliographic
http://www.elsevier. ... 405891/bibliographic

DOI: 10.1016/j.apenergy.2023.122460

Access Statistics for this article

Applied Energy is currently edited by J. Yan

More articles in Applied Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:appene:v:357:y:2024:i:c:s030626192301824x