An integrated method to simultaneously optimise a wind farm’s internal network layout, cable cross-sections and substation location
Andrzej Wędzik,
Michał Szypowski and
Tomasz Siewierski
Applied Energy, 2025, vol. 377, issue PA, No S0306261924017446
Abstract:
The internal power grid of a wind farm resembles an extensive network structure. The farm’s main power station (MPS), wind turbines, and the cables connecting them are usually spread over large areas of land or seabed. The cost of each component of such a network represents a considerable proportion of the total investment. By investing significant funds in the overall project, the investor expects to minimise the costs associated with the investment while making the highest possible profit from operating the planned wind farm. Therefore, even at the design stage, efforts should be made to locate the MPS and configure the internal connections of the wind farm in such a way that the costs are as low as possible while meeting the technical requirements. The paper proposes an integrated methodology for solving the problem of simultaneously determining the location of the MPS, selecting the connection structure and cable cross-sections of the internal network of a wind farm while complying with the technical constraints required by the regulations, such as the current carrying capacity of the cables and the permissible voltage drops. The primary objective of the optimisation is to find a location for a substation and the internal structure of the wind farm network that minimises the cable-related costs (investment and active power losses) for such a specific network structure. The authors demonstrate the effectiveness and usefulness of using an integrated algorithm based on Mixed Integer Nonlinear Programming with binary variables (MINLP). The calculations also show the usefulness and necessity of considering the active energy losses in the cables of the designed network. These costs are comparable to the costs of laying cables and have a major influence on the final shape and structure of the designed network and the cross-sections of the cables used.
Keywords: Renewable energy; Wind energy; Wind farm; Wind farm layout optimisation; Cable layout optimisation; Mixed integer nonlinear programming (MINLP) (search for similar items in EconPapers)
Date: 2025
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0306261924017446
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:appene:v:377:y:2025:i:pa:s0306261924017446
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/bibliographic
http://www.elsevier. ... 405891/bibliographic
DOI: 10.1016/j.apenergy.2024.124361
Access Statistics for this article
Applied Energy is currently edited by J. Yan
More articles in Applied Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().