Harnessing hydropower: A practical guide
Trevor Price and
Douglas Probert
Applied Energy, 1997, vol. 57, issue 2-3, 175-251
Abstract:
Macro and micro hydropower systems are described, along with a consideration of the technical and environmental problems involved. A case study, with Bargoed in the Rhymney Valley, South Wales as the proposed site is then presented, with some of the issues involved when choosing a specific hydropower-harnessing scheme discussed. In conclusion, a set of associated proposals, which would improve the Rhymney Valley in an environmentally- and socially-beneficial way, are described.
Date: 1997
References: View complete reference list from CitEc
Citations: View citations in EconPapers (11)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0306-2619(97)00033-0
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:appene:v:57:y:1997:i:2-3:p:175-251
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/bibliographic
http://www.elsevier. ... 405891/bibliographic
Access Statistics for this article
Applied Energy is currently edited by J. Yan
More articles in Applied Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().