Revisiting the construction of the Empire State Building: Have we forgotten something?

Mattias Jacobsson and Timothy L. Wilson

Business Horizons, 2018, vol. 61, issue 1, 47-57

Abstract: What’s past is prologue. Or is it? The construction of the Empire State Building (ESB) was not only the fastest erection of a skyscraper ever, but the construction company that took on the job allegedly began with no equipment or supplies that would be adequate for the job. The project was completed ahead of schedule and under budget; instead of 1year and 6 months as anticipated, it only took 1year and 45 days. The costs totaled $24.7 million instead of the estimated $43 million. So, we ask, how was this possible and is there something we could learn? Based on a review of existing literature describing the history and construction of the ESB, we outline strategic, operational, and contextual explanations for what appears to be a truly successful megaproject. We illustrate how, for example, inspiration from Henry Ford’s assembly line technique, the uniqueness of the logistics during the construction period, the economic decline of the Depression, and early ideas of concurrent engineering and fast-track construction enabled the success. Our conclusion is that there are lessons to be learned in going back to basics when tackling a megaproject.

Keywords: Empire State Building; Megaprojects; Project management; Empire State Realty Trust (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0007681317301258
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:bushor:v:61:y:2018:i:1:p:47-57

DOI: 10.1016/j.bushor.2017.09.004

Access Statistics for this article

Business Horizons is currently edited by C. M. Dalton

More articles in Business Horizons from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:bushor:v:61:y:2018:i:1:p:47-57