EconPapers    
Economics at your fingertips  
 

An inference about the length of the time-to-build period

Yong-Gook Jung

Economic Modelling, 2013, vol. 33, issue C, 42-54

Abstract: This study attempts to infer the length of aggregate time-to-build period by estimating DSGE models with different investment lags and comparing their fits to the data. The models considered in this study use two, four, six, and eight quarters of investment lags. The Bayesian estimation result indicates that the model with six quarters of investment lags fits the data significantly better than the others.

Keywords: Time-to-build; DSGE model; Bayesian estimation (search for similar items in EconPapers)
JEL-codes: C51 E22 E32 (search for similar items in EconPapers)
Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0264999313001132
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ecmode:v:33:y:2013:i:c:p:42-54

DOI: 10.1016/j.econmod.2013.03.009

Access Statistics for this article

Economic Modelling is currently edited by S. Hall and P. Pauly

More articles in Economic Modelling from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ecmode:v:33:y:2013:i:c:p:42-54