Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach
Chao-Tang Tseng,
Mei-Fang Wu,
Hong-Dar Lin and
Yuan-Shyi Peter Chiu
Economic Modelling, 2014, vol. 36, issue C, 30-36
Abstract:
This paper is concerned with solving a vendor–buyer integrated inventory problem with rework and a specific multi-delivery policy by a two-phase algebraic approach. Conventional method to the problem is to use differential calculus and Hessian matrix equations to prove convexity of system cost function first before determining the optimal production–shipment policy for such a vendor–buyer integrated system (Chiu et al., 2013b). This study presents an alternative two-phase algebraic approach to derive the same optimal policy. The proposed straightforward algebraic derivations can assist practitioners who may not have sufficient knowledge of calculus in understanding with ease such a real life vendor–buyer integrated system.
Keywords: Vendor–buyer system; Production–shipment policy; Optimization; Production lot-size; Multiple deliveries; Algebraic approach (search for similar items in EconPapers)
JEL-codes: C02 C44 C61 M11 (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0264999313003738
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ecmode:v:36:y:2014:i:c:p:30-36
DOI: 10.1016/j.econmod.2013.09.013
Access Statistics for this article
Economic Modelling is currently edited by S. Hall and P. Pauly
More articles in Economic Modelling from Elsevier
Bibliographic data for series maintained by Catherine Liu ().