Exact solution procedures for the balanced unidirectional cyclic layout problem
Temel Öncan and
I. Kuban AltInel
European Journal of Operational Research, 2008, vol. 189, issue 3, 609-623
Abstract:
In this paper, we consider the balanced unidirectional cyclic layout problem (BUCLP) arising in the determination of workstation locations around a closed loop conveyor system, in the allocation of cutting tools on the sites around a turret, in the positioning of stations around a unidirectional single loop AGV path. BUCLP is known to be NP-Complete. One important property of this problem is the balanced material flow assumption where the material flow is conserved at every workstation. We first develop a branch-and-bound procedure by using the special material flow property of the problem. Then, we propose a dynamic programming algorithm, which provides optimum solutions for instances with up to 20 workstations due to memory limitations. The branch and bound procedure can solve problems with up to 50 workstations.
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(06)01172-6
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:189:y:2008:i:3:p:609-623
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().