Using a risk-based approach to project scheduling: A case illustration from semiconductor manufacturing
Ascensión Zafra-Cabeza,
Miguel A. Ridao and
Eduardo F. Camacho
European Journal of Operational Research, 2008, vol. 190, issue 3, 708-723
Abstract:
This paper introduces a risk-based optimization method to schedule projects. The method uses risk mitigation and optimal control techniques to minimize variables such as the project duration or the cost estimate at completion. Mitigation actions reduce the risk impacts that may affect the system. A model predictive control approach is used to determine the set of mitigation actions to be executed and the time in which they are taken. A real-life project in the field of semiconductor manufacturing has been taken as an example to show the benefits of the method in a deterministic case and a Monte Carlo simulation has also been carried out.
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(07)00577-2
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:190:y:2008:i:3:p:708-723
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().