Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing
Ruud Teunter,
Konstantinos Kaparis and
Ou Tang
European Journal of Operational Research, 2008, vol. 191, issue 3, 1241-1253
Abstract:
We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the optimal cycle time with a mixed integer programming (MIP) formulation of the problem given a fixed cycle time. Using case study data from an auto part producer, we perform a sensitivity study on the effects of key problem parameters such as demand rates and return fractions. Furthermore, by comparing to results in Tang and Teunter [Tang, O., Teunter, R.H., 2006. Economic lot scheduling problem with returns. Production and Operations Management] for the situation where all operations are performed on the same line, we analyze the cost benefits of using dedicated lines.
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (26)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(07)00873-9
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:191:y:2008:i:3:p:1241-1253
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().