Solving multi-criteria scheduling flow shop problem through compromise programming and satisfaction functions
Mohamed Anis Allouche,
Belaïd Aouni,
Jean-Marc Martel,
Taïcir Loukil and
Abdelwaheb Rebaï
European Journal of Operational Research, 2009, vol. 192, issue 2, 460-467
Abstract:
The multi-criteria scheduling problem is one of the main research subjects in the field of multiple objectives programming. Several procedures have been developed to deal with this type of problem where some conflicting criteria have to be optimized simultaneously. The aim of our paper is to propose an aggregation procedure that integrates three different criteria to find the best sequence in a flow shop production environment. The compromise programming model and the concept of satisfaction functions will be utilized to integrate explicitly the manager's preferences according to the deviations between the achievement and the aspiration levels of the following criteria: Makespan, total flow time and total tardiness.
Keywords: Flow; shop; Multi-criteria; scheduling; Compromise; programming; Satisfaction; functions; Manager's; preferences (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(07)00997-6
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:192:y:2009:i:2:p:460-467
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().