Scheduling of corrugated paper production
Kazuki Matsumoto,
Hiroyoshi Miwa and
Toshihide Ibaraki
European Journal of Operational Research, 2009, vol. 192, issue 3, 782-792
Abstract:
Corrugated paper is produced by gluing three types of papers of the same breadth. Given a set of orders, we first assign each order to one of the standard breadths, and then sequence those assigned to each standard breadth so that they are continuously manufactured from the three rolls of the specified standard breadth equipped in the machine called corrugator. Here we are asked to achieve multi-goals of minimizing total length of roll papers, total loss of papers caused by the differences between standard breadths and real breadths of the orders, and the number of machine stops needed during production. We use integer programming to assign orders to standard breadths, and then develop a special purpose algorithm to sequence the orders assigned to each standard breadth. This is a first attempt to handle scheduling problems of the corrugator machine.
Keywords: Scheduling; Corrugated; paper; Complexity; Contiguous; set; Integer; programming (search for similar items in EconPapers)
Date: 2009
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(07)01025-9
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:192:y:2009:i:3:p:782-792
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().