EconPapers    
Economics at your fingertips  
 

Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals

Albert Corominas and Rafael Pastor

European Journal of Operational Research, 2009, vol. 193, issue 2, 639-643

Abstract: We introduce and formalise a scheduling problem that consists in determining an optimum policy (i.e. one that minimises total inventory holding costs) to produce n part-types using a system that is able to share its capacity at all times among these part-types and that switches between an active and an inactive state for pre-known periods of time. Consequently, when active the system must produce enough reserves to meet the demand during the inactive interval. We show that there is always a simple optimum policy in which the production of the part-types is prioritised and, provided the units are properly defined, the optimum priority ordering corresponds to a non-decreasing sequence of the unit holding costs of the part-types.

Keywords: Scheduling; Multiple; part-types; production; Failure-prone; systems; Cumulative; resources (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(08)00163-X
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:193:y:2009:i:2:p:639-643

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:193:y:2009:i:2:p:639-643