EconPapers    
Economics at your fingertips  
 

A note on the proportionate flow shop with a bottleneck machine

Christos Koulamas and George J. Kyparisis

European Journal of Operational Research, 2009, vol. 193, issue 2, 644-645

Abstract: Choi, B.-C., Yoon, S.-H., Chung, S.-J., 2007. Minimizing maximum completion time in a proportionate flow shop with one machine of different speed. European Journal of Operational Research 176, 964-974 consider the proportionate flow shop with a slow bottleneck machine and propose the SLDR heuristic for it. Choi et al. (2007) derive a data-dependent worst-case ratio bound for the SLDR heuristic which is then bounded by two. In this note, we show that the tight worst-case ratio bound of the SLDR heuristic is 3/2.

Keywords: Flow; shop; sequencing; Proportionate; flow; shop; Makespan; Approximation; algorithms (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(08)00168-9
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:193:y:2009:i:2:p:644-645

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:193:y:2009:i:2:p:644-645