A note on the proportionate flow shop with a bottleneck machine
Christos Koulamas and
George J. Kyparisis
European Journal of Operational Research, 2009, vol. 193, issue 2, 644-645
Abstract:
Choi, B.-C., Yoon, S.-H., Chung, S.-J., 2007. Minimizing maximum completion time in a proportionate flow shop with one machine of different speed. European Journal of Operational Research 176, 964-974 consider the proportionate flow shop with a slow bottleneck machine and propose the SLDR heuristic for it. Choi et al. (2007) derive a data-dependent worst-case ratio bound for the SLDR heuristic which is then bounded by two. In this note, we show that the tight worst-case ratio bound of the SLDR heuristic is 3/2.
Keywords: Flow; shop; sequencing; Proportionate; flow; shop; Makespan; Approximation; algorithms (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(08)00168-9
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:193:y:2009:i:2:p:644-645
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().