Erratum to "A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time" [European Journal of Operational Research, 184 (2) (2008), 810-813]
Daniel Baraz and
Gur Mosheiov
European Journal of Operational Research, 2009, vol. 197, issue 2, 844-844
Date: 2009
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(08)00519-5
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:197:y:2009:i:2:p:844-844
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().