Scheduling projects with stochastic activity duration to maximize expected net present value
Matthew J. Sobel,
Joseph G. Szmerekovsky and
Vera Tilson
European Journal of Operational Research, 2009, vol. 198, issue 3, 697-705
Abstract:
Although uncertainty is rife in many project management contexts, little is known about adaptively optimizing project schedules. We formulate the problem of adaptively optimizing the expected present value of a project's cash flow, and we show that it is practical to perform the optimization. The formulation includes randomness in activity durations, costs, and revenues, so the optimization leads to a recursion with a large state space even if the durations are exponentially distributed. We present an algorithm that partially exercises the "curse of dimensionality" as computational results demonstrate. Most of the paper is restricted to exponentially distributed task durations, but we sketch the adaptation of the algorithm to approximate any probability distribution of task duration.
Keywords: Project; scheduling; Dynamic; programming (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (25)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(08)00829-1
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:198:y:2009:i:3:p:697-705
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().