Computing latest starting times of activities in interval-valued networks with minimal time lags
Siamak Haji Yakhchali and
Seyed Hassan Ghodsypour
European Journal of Operational Research, 2010, vol. 200, issue 3, 874-880
Abstract:
This paper deals with problems of determining possible values of earliest and latest starting times of an activity in networks with minimal time lags and imprecise durations that are represented by means of interval or fuzzy numbers. Although minimal time lags are practical in different projects, former researchers have not considered these problems. After proposing propositions which reduce the search space, a novel polynomial algorithm is presented to compute intervals of possible values of latest starting times in interval-valued networks with minimal time lags. Then, the results are extended to networks with fuzzy durations.
Keywords: Project; management; and; scheduling; Fuzzy; intervals; Fuzzy; PERT/CPM (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(09)00055-1
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:200:y:2010:i:3:p:874-880
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().