Minimum weighted number of tardy jobs on an m-machine flow-shop with a critical machine

Gur Mosheiov and Assaf Sarig

European Journal of Operational Research, 2010, vol. 201, issue 2, 404-408

Abstract: We study a flow-shop problem, where each of the jobs is limited to no more than two operations. One of these operations is common for all the jobs, and is performed on the same ("critical") machine. Reflecting many applications, jobs are assumed to be processed in blocks on the critical machine. All the jobs share a common due-date, and the objective is minimum weighted number of tardy jobs. We prove that the problem is NP-hard. Then we formulate the problem as an integer program, and introduce a pseudo-polynomial dynamic programming algorithm, proving that the problem is NP-hard in the ordinary sense. We also propose an efficient heuristic, which is shown numerically to produce very close-to-optimal schedules. Finally, we show that the special case of identical weights is polynomially solvable.

Keywords: Scheduling; Flow-shop; Weighted; number; of; tardy; jobs; Critical; machine (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(09)00190-8
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:201:y:2010:i:2:p:404-408

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:201:y:2010:i:2:p:404-408