A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns"
Yuan-Shyi Peter Chiu and
Chia-Kuan Ting
European Journal of Operational Research, 2010, vol. 201, issue 2, 641-643
Abstract:
In a recently published paper by Chiu et al. [Chiu, S.W., Wang, S.-L., Chiu, Y.-S.P., 2007. Determining the optimal run time for EPQ model with scrap, rework and stochastic breakdowns. European Journal of Operational Research 180, 664-676], a theorem on conditional convexity of the integrated total cost function was employed in their solution procedure. We reexamine this theorem and present a direct proof to the convexity of the total cost function. This proof can be used in place of Theorem 1 of Chiu et al.'s paper to enhance quality of their optimization process.
Keywords: Manufacturing; Machine; breakdown; Defective; item; Rework; Production (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(09)00162-3
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:201:y:2010:i:2:p:641-643
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().