EconPapers    
Economics at your fingertips  
 

Scheduling three chains on two parallel machines

Alessandro Agnetis, Marta Flamini, Gaia Nicosia and Andrea Pacifici

European Journal of Operational Research, 2010, vol. 202, issue 3, 669-674

Abstract: We consider the problem of scheduling n tasks subject to chain-precedence constraints on two identical machines with the objective of minimizing the makespan. The problem is known to be strongly NP-hard. Here, we prove that it is binary NP-hard even with three chains. Furthermore, we characterize the complexity of this case by presenting a pseudopolynomial time algorithm and a fully polynomial time approximation scheme.

Keywords: Computational; complexity; Scheduling; Parallel; machines; Approximation (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(09)00504-9
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:202:y:2010:i:3:p:669-674

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:202:y:2010:i:3:p:669-674