Optimizing production and transportation in a commit-to-delivery business mode
Rafael A. Melo and
Laurence A. Wolsey
European Journal of Operational Research, 2010, vol. 203, issue 3, 614-618
Abstract:
In problems involving the simultaneous optimization of production and transportation, the requirement that an order can only be shipped once its production has been completed is a natural one. One example is a problem of optimizing shipping costs subject to a production capacity constraint studied recently by Stecke and Zhao. Here we present an integer programming formulation for the case in which only completed orders can be shipped that leads to very tight dual bounds and enables one to solve instances of significant size to optimality.
Keywords: Integer; programming; Production; Transportation (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(09)00602-X
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:203:y:2010:i:3:p:614-618
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().