On-line two-machine open shop scheduling with time lags
Xiandong Zhang and
Steef van de Velde
European Journal of Operational Research, 2010, vol. 204, issue 1, 14-19
Abstract:
We analyze the performance of the greedy algorithm for the on-line two-machine open shop scheduling problem of minimizing makespan, in which time lags exist between the completion time of the first and the start time of the second operation of any job. The competitive ratio for the greedy algorithm is 2, and it can be reduced to 5/3 if the maximum time lag is less than the minimum positive processing time of any operation. These ratios are tight. We also prove that no on-line non-delay algorithm can have a better competitive ratio. As far as delay algorithms are concerned, no algorithm can do better than the greedy algorithm for the non-clairvoyant variant of the problem. For the clairvoyant variant, no on-line delay algorithm has a competitive ratio better than .
Keywords: On-line; scheduling; Open; shops; Time; lags; Greedy; algorithm; Worst; case; analysis (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(09)00638-9
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:204:y:2010:i:1:p:14-19
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().