Scheduling multiple orders per job in a single machine to minimize total completion time
Scott J. Mason and
Jen-Shiang Chen
European Journal of Operational Research, 2010, vol. 207, issue 1, 70-77
Abstract:
This paper deals with a single-machine scheduling problem with multiple orders per job (MOJ) considerations. Both lot processing machines and item processing machines are also examined. There are two primary decisions that must be made in the proposed problem: (1) how to group the orders together, and (2) how to schedule the jobs once they are formed. In order to obtain the optimal solution to a scheduling problem, these two decisions should be made simultaneously. The performance measure is the total completion time of all orders. Two mixed binary integer programming models are developed to optimally solve this problem. Also, two efficient heuristics are proposed for solving large-sized problems. Computational results are provided to demonstrate the efficiency of the models and the effectiveness of the heuristics.
Keywords: Scheduling; Multiple; orders; per; job; Integer; programming; Heuristics; Semiconductor; manufacturing (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(10)00261-4
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:207:y:2010:i:1:p:70-77
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().