A note on the modelling of project networks with time constraints
Massimiliano Caramia and
Francesca Guerriero
European Journal of Operational Research, 2011, vol. 211, issue 3, 666-670
Abstract:
In this note we show how to manage, by means of Generalized Precedence Relationships, some kinds of temporal constraints introduced by Chen et al. (1997) in project networks.
Keywords: Project; scheduling; Time; constraints; Project; network (search for similar items in EconPapers)
Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377-2217(10)00886-6
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:211:y:2011:i:3:p:666-670
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().