Capital renewal as a real option
Matthew J. Reindorp and
Michael C. Fu
European Journal of Operational Research, 2011, vol. 214, issue 1, 109-117
Abstract:
We consider the timing of replacement of obsolete subsystems within an extensive, complex infrastructure. Such replacement action, known as capital renewal, must balance uncertainty about future profitability against uncertainty about future renewal costs. Treating renewal investments as real options, we derive an optimal solution to the infinite horizon version of this problem and determine the total present value of an institution's capital renewal options. We investigate the sensitivity of the infinite horizon solution to variations in key problem parameters and highlight the system scenarios in which timely renewal activity is most profitable. For finite horizon renewal planning, we show that our solution performs better than a policy of constant periodic renewals if more than two renewal cycles are completed.
Keywords: Investment; analysis; Maintenance; Replacement; Facilities; planning; and; design; Simulation (search for similar items in EconPapers)
Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (12)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221711002797
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:214:y:2011:i:1:p:109-117
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().