Adaptive policies for multi-mode project scheduling under uncertainty
Pedro Godinho () and
Fernando G. Branco
European Journal of Operational Research, 2012, vol. 216, issue 3, 553-562
Abstract:
In this paper we propose an adaptive model for multi-mode project scheduling under uncertainty. We assume that there is a due date for concluding the project and a tardiness penalty for failing to meet this due date, and that several distinct modes may be used to undertake each activity. We define scheduling policies based on a set of thresholds. The starting time of the activity is compared with those thresholds in order to define the execution mode.
Keywords: Project scheduling; Project management; Metaheuristics; Simulation (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221711007296
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:216:y:2012:i:3:p:553-562
DOI: 10.1016/j.ejor.2011.08.010
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().