EconPapers    
Economics at your fingertips  
 

Preemptive scheduling of two uniform parallel machines to minimize total tardiness

Irina N. Lushchakova

European Journal of Operational Research, 2012, vol. 219, issue 1, 27-33

Abstract: We consider the problem of preemptive scheduling n jobs on two uniform parallel machines. All jobs have equal processing requirements. For each job we are given its due date. The objective is to find a schedule minimizing total tardiness ∑Ti. We suggest an O(nlogn) algorithm to solve this problem.

Keywords: Scheduling; Uniform machines; Total tardiness; Polynomial algorithm (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221711010290
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:219:y:2012:i:1:p:27-33

DOI: 10.1016/j.ejor.2011.11.023

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:219:y:2012:i:1:p:27-33